This partial calculator converts selected position count, cycle share and cycle time into schedule arithmetic. It does not reconstruct Hiscox movement 956, the cited rack mechanism, or any index-and-lock geometry.
Partial · Selected Cycle-Schedule Ledger
Convert selected cycle values without claiming an index, engagement or lock mechanism.
Equation Used
- N is a selected count only.
- Active share is user-selected and not derived from geometry.
- Contact, index, lock, clearance, load and safety are excluded.
The figure is a schedule dial, not a stop-motion gear.
Supported selected schedule arithmetic
Selected sector size is 360/N, active time is cycle time times selected active share, remaining share is 100 minus active share and remaining time is cycle time minus active time.
Use and boundary
Use as an abstract cycle schedule only, not as an engagement, index or dwell prediction.
Schedule identities
sector=360/N; active time=Tq/100; remainder=100-q; remaining time=T-active time.
Default example
For N=8, q=21% and T=4 s, selected sector is 45 degrees, active time is 0.84 s and remaining time is 3.16 s.
Unsupported mechanism claims removed
Follower indexing, spiral-tooth engagement and locking-pocket dwell were removed because the cited sources do not define that geometry.
Questions
Is active share an engagement prediction?
No. It is a selected schedule percentage.
Does N define a follower wheel?
No.
References
References & Further Reading
- Wikipedia contributors. Intermittent mechanism. Wikipedia
Building or designing a mechanism like this?
Explore the precision-engineered motion control hardware used by mechanical engineers, makers, and product designers.