Hiscox identifies the revolving hoisting dredge as a Lancaster-pattern machine balanced on a railway truck and equipped with a clamshell bucket. The bucket handles separate loads. A continuous bucket-ladder dredge instead carries many buckets around an inclined ladder; the calculator below illustrates that second type and estimates its delivered loose volume.

Bucket-Ladder Dredge Volume Calculator

Estimate loose material delivered by a continuous bucket line. This drawing shows a bucket-ladder dredge, not the railway-mounted Lancaster clamshell machine. Playback takes eight seconds per loop and does not follow the entered bucket rate.

0°

Ideal Loose Volume Rate
--
Selected-Day Loose Volume
--
Selected Loaded Bucket Volume
--
Selected-Day Bucket Events
--

Equation Used

C_L = CF; Q = CNF(60/27); V = QH; B = 60NH.
Ideal delivered loose bucket volume only. Productive hours exclude downtime; no in-situ, swell, recovery, load or rating prediction is made.
  • Each bucket event delivers nominal bucket volume times the selected fill fraction.
  • Selected bucket rate remains constant during the selected productive hours.
  • 27 cubic feet equals one cubic yard; results are delivered loose bucket volume, not in-situ volume.
  • Spillage, downtime, maneuvering, material behavior, plant limits, recovery, loads and ratings are excluded.

The companion drawing repeats the continuous bucket-ladder arrangement shown in the calculator.

Same mechanism and inputs as the interactive calculator.

Revolving hoist and continuous bucket line

In entry 1257, Hiscox describes a Lancaster-pattern revolving hoisting dredge with a clamshell bucket, balanced on a railway truck. Its lifting attachment handles one bucket load at a time.

The animated calculator on this page shows a different arrangement: an endless bucket chain running around an inclined ladder on a floating hull. Buckets lift material to the upper tumbler, where it enters a hopper or chute. A hoist controls ladder elevation, while cables and a spud can position the hull through a cut.

The drawing and four inputs apply to that continuous bucket line. They do not describe the Lancaster machine or calculate its hoisting cycle.

Where bucket-line calculations help

For a continuous dredge, bucket size, average fill and buckets passing per minute establish a first estimate of material delivery. The productive-hours input extends that hourly rate across the time spent delivering material.

Use measured operating values when available. The result is loose material carried in buckets, not the volume occupied by undisturbed ground and not the quantity of recovered mineral. Actual output also depends on spillage, interruptions and the capacity of the receiving plant.

Ideal bucket-line volume arithmetic

Let C be nominal bucket volume in ft³, N the number of bucket events per minute, F the selected filled fraction and H the selected productive hours. Loaded volume per bucket is CL = CF. Ideal delivered loose volume is Q = CNF(60/27) yd³/h. The selected-day total is V = QH, and bucket events per selected day are B = 60NH.

The conversion uses 27 ft³ = 1 yd³. Because no swell or bank-density input is provided, Q and V must not be interpreted as in-situ excavation volume.

Worked bucket-line example

With an 8 ft³ nominal bucket, 20 bucket events per minute and 80% fill, the selected loaded volume is 6.4 ft³ per bucket. Ideal delivered loose volume is 284.4 yd³/h. Over 20 productive hours, the arithmetic total is 5,689 yd³ from 24,000 bucket events.

If the entered fill already represents partially filled buckets, that effect is included. Downtime within the entered hours, additional spillage or a lower achieved fill reduces delivery below the estimate.

Reading the animation and results

The twelve bucket symbols complete a loop in eight seconds for readability. Changing bucket rate updates the calculated volumes and bucket count, but does not change playback speed. The green symbols respond to fill percentage; they do not show individual buckets filling and emptying. The hull and ladder stay fixed, and the orange arc indicates hull swing rather than animating it.

The bucket path and machine proportions are illustrative. Use the numeric results for volume estimates. Ladder angle, bucket spacing, hoist loads, cable tension, hull stability and power demand are not calculated.

A clamshell hoist needs a different timing model that includes lowering, filling, lifting, slewing and unloading each load. The continuous bucket-line rate used here is not a cycle-time estimate for that machine.

Dredge calculator questions

Which dredge does the calculator show?

It shows a floating continuous bucket-ladder dredge. Hiscox entry 1257 describes a railway-mounted Lancaster clamshell dredge, whose grab-and-hoist cycle is not modeled here.

Is the result in-situ excavation volume?

No. It is loose volume delivered in buckets. Converting it to undisturbed ground volume requires material-specific measurements.

What does bucket fill mean?

It is the average carried volume as a percentage of nominal bucket capacity. Entering 80% means an 8 ft³ bucket carries 6.4 ft³ on average.

Does bucket rate control animation speed?

No. The drawing runs at eight seconds per loop. Bucket rate changes the numerical delivery rate and bucket count.

Which hours should I enter?

Enter hours of productive bucket-line operation. Include only time represented by the bucket rate and fill values; account separately for downtime.

Does the calculator size the hoist or spud?

No. It estimates volume and bucket count, not forces, power, structural strength, stability or component ratings.

Historical and technical references

Gardner D. Hiscox, Mechanical Movements, Powers, Devices and Appliances, entry 1257: Lancaster-pattern revolving hoisting dredge with a clamshell bucket.