A continuous ditching dredge excavates and carries material on successive buckets attached to an endless chain. The historical arrangement shown here includes an inclined bucket ladder and an overhead carrier that delivers spoil to the bank. The calculator estimates steady throughput from bucket capacity, discharge rate, fill and swell.
Continuous Ditching Dredge Interactive Calculator
Explore the bucket chain and overhead spoil carrier. Change capacity, bucket rate, fill and swell to compare loose excavated volume with the corresponding original bank volume.
Equation Used
- Steady discharge rate and identical bucket capacity.
- Entered fill and swell remain fixed; they are not predicted from soil, chain speed or excavation forces.
- Continuous operation without downtime, skipped loading or material lost between bucket and discharge.
- The drawing uses twelve similarly shaped buckets and an illustrative machine layout. Rounded turns, straight return and particle routes are schematic.
- No chain strength, digging power, stability, anchoring or operating limits are calculated.
Volume increase is the difference between loose and bank volume. It is not material lost from the dredger.
The bucket cycle and spoil route
Buckets gather material at the lower end, carry it upward and turn over the upper tumbler to discharge. They then return empty. A chute receives the discharged material and feeds the carrier. The cutaway shows the bucket discharge, receiving chute and carrier.
Hiscox figure 1255 identifies the overhead bank-discharge carrier. TU Delft’s bucket-dredger material provides the fuller ladder, bucket and pontoon construction reference. The illustration combines that documented arrangement with a simplified side view; it is not a scale reproduction of a particular machine.
The animation’s twelve buckets remain attached to a continuous path and rotate with the direction of the chain at the end turns. The rounded turns and straight return replace polygonal engagement and hanging-chain detail. The little falling particles indicate the spoil route rather than a calculated trajectory.
Comparing production assumptions
This worksheet compares production assumptions for a bucket-chain excavation process. It can show, for example, how changing discharge rate affects volume per hour while capacity, fill and swell remain fixed.
It does not establish whether a particular soil can be cut at that rate, whether the machine has adequate power, or which mobility and anchoring arrangement is needed. A steady-output calculation should be kept separate from those design questions.
Keeping loose and bank volumes distinct
Let C be nominal bucket capacity in litres, n bucket discharges per minute, f the entered fill fraction, and s the swell ratio (loose volume divided by original bank volume).
Each discharge contains Cf/1000 cubic metres of loose material. There are 60n discharges in an hour, giving Qloose=(C/1000)×n×60×f. The corresponding bank throughput is Qbank=Qloose/s.
The remaining results are 60n buckets per hour and Qloose−Qbank cubic metres per hour of volume increase. The latter is the difference between two volume measures of the same material, not a mass balance or a loss of spoil.
The fill and swell inputs are independent assumptions. The formula does not reduce fill automatically when bucket rate is increased. Predicting that relationship would require excavation and material data.
Example with the initial settings
For a 300 L bucket at 22 buckets/min and a fill fraction of 0.85, the loose contents per bucket are 255 L. There are 1,320 discharges per hour, so loose throughput is 336.6 m³/h.
With a swell ratio of 1.25, bank throughput is 336.6/1.25=269.28 m³/h. The volume difference is 67.32 m³/h. Both measures describe the same excavated material.
Doubling capacity, rate or fill doubles both throughput values while the other entries remain fixed. Increasing swell reduces bank throughput for the same loose output. At a swell ratio of one, the two volume measures are equal.
Where this calculation stops
The displayed output is a steady theoretical rate. It has no allowance for repositioning, stoppages, variable loading or material falling outside the intended discharge route. These are additional operating effects, not hidden corrections in the calculator.
Bucket capacity alone also does not determine an exact bucket shape. The drawing scales a similar illustrative shape by the cube root of capacity so that the size change has a consistent volume relationship. Its support structure, pitch and cutting geometry are not sized from that capacity.
Chain wear, pin clearances, tooth hardness, digging speed limits and maintenance intervals require information about the actual machine and material. This calculator does not determine those values.
Questions about the dredge calculator
What does the volume increase represent?
The result is loose volume minus bank volume. Swelling changes the space occupied by the material; it does not represent lost material.
Does a higher bucket rate automatically mean lower fill?
Not in this model. Fill is a separate input held fixed until changed.
Why does swell change the chart but not the chain?
Swell converts between two material-volume measures. It does not set chain motion.
What controls playback speed?
The bucket-rate input. One circuit contains twelve buckets, so its duration is 720 divided by the rate in buckets/min, in seconds.
Does the drawing specify a real dredge?
No. It shows the documented operating arrangement with explicitly simplified bucket geometry, chain turns and transfer paths.
Related actuator design tools
This calculator estimates bucket-chain throughput. If a separate linear actuator adjusts a ladder or other component, its mounting geometry and load require their own calculation.
For electrical sizing, measure or calculate the current under load. Long wire runs and undersized supplies can make a correctly selected actuator behave like an undersized one.
The mechanism may also change speed as the linkage angle changes. A constant actuator extension speed does not always create constant output speed, so timing should be checked at the actual output point.
- Map actuator stroke to the actual output travel before choosing a model.
- Check for binding, changing leverage, and peak load near the ends of travel.
- Decide whether timed motion is acceptable or position feedback is required.
For a FIRGELLI design review, calculate the load case with the FIRGELLI actuator force calculator and plan the switching or controller arrangement with the linear actuator wiring diagram generator. If an actuator or cylinder is already installed, the linear actuator replacement finder helps keep the comparison tied to real dimensions.
Construction and calculation references
- Gardner D. Hiscox, Mechanical Movements, Powers, Devices and Appliances, figure 1255, printed page 309 (PDF 319): continuous ditching dredge with overhead spoil carrier.
- W.J. Vlasblom, TU Delft: The Bucket Dredger, construction photograph and production discussion. Explains the bucket cycle and fill/bulking terms.
The equations are explicitly derived above. The illustration simplifies the bucket geometry and chain path to show the excavation and discharge cycle.
Continue exploring engineering
Find another tool, explore an animated mechanism, or browse resources by subject.
Building or designing a mechanism like this?
Explore the precision-engineered motion control hardware used by mechanical engineers, makers, and product designers.