This page now separates the documented rail-road excavator topology from a declared arithmetic scenario. Bucket size, fill factor, density, cycle time and time factor are all user inputs; the result is not measured output or a machine rating.
Declared Excavation Cycle Ledger
Enter a declared cycle time, bucket volume, fill factor, material density and productive-time factor. The worksheet applies exact bookkeeping identities without predicting performance.
Equation Used
- Cycle time t_c is a positive declared average for the hypothetical scenario.
- Bucket volume, fill factor and material density are independent user declarations.
- The productive-time factor eta is declared rather than predicted from delays or availability.
- The connected two-link boom/stick animation is qualitative and keeps its displayed link lengths fixed.
- Rail wheels and rubber tyres are shown only to identify the rail-road topology documented by Liebherr.
- Machine-specific bucket limits, lift chart, hydraulic limits, stability, rail loads, work envelope, material behavior, operator effects, availability, selection, operation and safety are excluded.
Retains exact declared cycle arithmetic while removing the implication that user inputs predict achieved production, capacity, stability or safe railway operation.
Hydraulic work equipment on a road-and-rail undercarriage
Liebherr describes railroad excavators that work on roads and railway tracks. Its A 922 Rail documentation shows rail travel drives on the undercarriage and hydraulic attachments operating through dedicated circuits.
The animation preserves only that qualitative identity: rail wheels beneath the chassis and a connected two-link boom/stick chain. It is not a lift-chart or stability model.
Use this only as a declared bookkeeping scenario
The worksheet calculates scheduled cycles, declared bucket mass, an ideal scheduled mass rate and a rate after applying a declared productive-time factor.
It cannot select a machine, attachment or work method, and it cannot predict achieved production.
Declared cycle identities
The time factor is entered, not inferred from a jobsite or machine.
A transparent declared example
For t_c=20 s, V_b=0.80 m3, f_f=0.85, rho=1.60 t/m3 and eta=0.75, scheduled cycles are 180/h, declared bucket mass is 1.09 t, declared-adjusted mass rate is 146.9 t/h and the declared difference is 49.0 t/h.
A ledger is not a production guarantee
USACE notes that production depends on bucket characteristics, material, face geometry, operator efficiency and cycle time. Railroad operation also adds machine-specific stability, rail-load and work-envelope constraints.
The former guaranteed-production, site, deployment and field operating claims are removed.
Rail-excavator ledger questions
Is eta predicted?
No; it is declared.
Is the bucket mass a rated payload?
No.
Does the animation check stability?
No.
Does the result predict achieved tonnes per hour?
No.
Rail-road excavator and productivity references
- Liebherr Railroad Excavators: manufacturer overview and current road/rail machine specifications.
- Liebherr A 922 Rail description: rail travel-drive and hydraulic work-equipment topology.
- USACE EM 1110-2-5025: production dependencies including bucket characteristics, material, fill factor, operator efficiency and cycle time.
Continue exploring engineering
Find another tool, explore an animated mechanism, or browse resources by subject.